Plumbing Projects
Scottsdale Healthcare Bridge Tower Addition is one of our many hospital projects and is located on the north end of the existing Shea Campus, southeast of the Piper Outpatient Surgery Center. The scope of this 40,000 square foot addition included extending existing hospital utilities, adding patient rooms, nursing stations and medical gas systems, as well…
Read MoreThe new hospital will provide much needed services for communities who have out grown the current Indian Health Services (IHS) clinic in Kayenta. The design layout includes the expansion of all existing clinics, such as dental, optical and radiology, as well as the addition of several new departments, which include inpatient care, ambulatory surgery, wellness…
Read MoreFlorence Hospital at Anthem is located on the corner of Hunt Highway and Franklin Road. The 36-bed, 96,000 square-foot-hospital opened with services that include Emergency, Inpatient/ICU, Correctional unit, OR/PACU, MRI, CT, Digital X-ray, Nuclear Medicine, Ultrasound, more than 300 employees and a medical staff roster of more than 105 physicians representing more than sixteen specialties.…
Read MoreRKS Plumbing & Mechanical Inc. teamed up with Layton Construction on a 3-story ground up medical center in central Phoenix. This project started as shell building with core restrooms and a large roof drainage system in the first phase, and evolved into a full service medical center that included additional restrooms, surgery rooms, patient rooms,…
Read MoreJob order contracting (JOC) is a way for organizations to get numerous, commonly encountered construction projects done quickly and easily through multi-year contracts. JOC reduces unnecessary levels of engineering, design, and contract procurement time along with construction project procurement costs by awarding long-term contracts for a wide variety of renovation, repair and construction projects. With…
Read MoreSodium Hypochlorite (Naocl) is manufactured on site with the high voltage generation system (image 1). This system replaces the potentially hazardous and unwieldy chlorine gas system as the source of disinfection chemical. Gas drawoff system (image 2) ventilates bulk storage tanks to prevent hydrogen gas build-up. The concession of chemical feed pumps shown (image 3)…
Read MoreOdor control is increasingly important as congestion increases, treatment facilities become constrained to populated areas and regulations grow. Upper and lower views of mechanical odor control scrubbers (image 1) serviced with hypochlorite and ferric chloride to remove hydrogen sulfide from the bulk chemical storage below (image 2). An open bed lava rock biological odor filter…
Read More